Allowing to "force" parent node remotely from MYSController (or gateway)
-
I have a problematic spot in my house that did fail very often. After taking the laptop there it was obvious that there were failed transmissions. I have connected a repeater but problem still remained. I moved the serial gateway to myscontroller and noticed that the node does not automatically connect to the repeater even after a long time with many failures. I have re-started everything in a sequence and forced parent id in the sketch and now everything is working fine. It would have been great if you could change the topology from the controller and write the parent id to the eeprom so it will become a permanent change. In larger sensor networks starting to update the sketches to all the sensors to bind them to a new repeater can be really tiresome.
Hello! It looks like you're interested in this conversation, but you don't have an account yet.
Getting fed up of having to scroll through the same posts each visit? When you register for an account, you'll always come back to exactly where you were before, and choose to be notified of new replies (either via email, or push notification). You'll also be able to save bookmarks and upvote posts to show your appreciation to other community members.
With your input, this post could be even better 💗
Register Login